PROJECTS
PROJECT PHOTO
HIGHWAY CROSSING
State Route Gas Main
A permitted crossing under a four-lane state route — completed in a single shift with zero lane closures and a passing inspection.
PROJECT PHOTO
FIBER BACKBONE
Telecom Conduit Run
Several thousand feet of conduit pulled through an established corridor, threading between existing utilities without a single strike.
PROJECT PHOTO
WATER SERVICE
Residential Subdivision
Water service laterals to a new build-out, bored under finished landscaping and driveways with no surface restoration needed.
PROJECT PHOTO
RIVER CROSSING
Creek Bore for Electric
A deep bore beneath a waterway for primary electric, engineered to keep the line well below the channel and outside the flood zone.
Address
6105 Birch Drive, Flint MI 48507